top of page
2E41C043-AB82-4F5D-83E3-BB5F2BE6E310_1_102_o.jpeg

Our Projects

SADB Directional Drilling - Blanchetown

At the Blanchetown SADB project, we completed a complex directional drilling operation beneath a highway and through a cliff to install a 350mm water pipeline. The project also included the installation of a 75kW submersible pump with VFD controls to efficiently pump water through a 3km pipeline to two separate poultry farms.

 

Key Achievements:

- Expert design, seamless installation, and comprehensive project management, ensuring the successful delivery of a critical water supply solution in a challenging environment.

bottom of page