Dam - Port Wakefield
This project entailed extensive earthworks for the construction of an 80m x 60m dam designed to manage wastewater from the RO filtration plant. This project required precise land shaping and compaction to ensure long-term stability and optimal functionality. Our skilled team utilized a range of advanced equipment, including a bulldozer, water truck, skid steer with laser grader, excavator, and roller, to execute the work efficiently and accurately. The result was a high-quality, durable dam structure built to meet the site's operational and environmental requirements.
Key Achievements:
- The successful containment of wastewater for evaporation, ensuring an environmentally responsible and efficient solution for site water management.
